Submission For DOE Approval
Submission For DOE Approval Submission For DOE Approval Environmental Consultancy Services Malaysia, Johor Bahru (JB), Johor Testing Service | PAC Testing & Consulting Sdn Bhd
Written Notification and Written Declaration

PAC provides documentation services for submission to obtain DOE Approval for Installation of Air Pollution Control System (APCS) such as:

1. Design and Fabrication of APCS.
2. Preparation of APCS Performance Monitoring Programme.
3. Installation of gauges such as Pressure Differential Meter.
4. Carry out Performance Monitoring FOR APCS.
 
System identification such as:
  • Dust Collector
  • Scrubber
  • Cyclone
  • Generator set
  • Fume Cupboard
  • Spray Booth
  • Oven
  • Boiler
Switch To Desktop Version